Location: Norrköping, Sweden.
Year: 2011.
More info: 20 m in diameter and 16 m high, 96 tons weight.


Location: Norrköping, Sweden.
Year: 2011.
More info: 16 m in diameter and 10 m high, weight 60 ton.

Location: Loviisa, Finland.
Year: 2011.

Location: Malmö, Sweden.
Year: 2011.


Location: Forssa, Finland.
Year: 2011.
More info: Havator Transport was responsible for the complete delivery of two 103-ton transformers from the Port of Hamburg to the foundations in Forssa in September 2011.




Location: Salla, Finland.
Year: 2011.
More info: http://www.salla.fi/Museo







Location: Suonenjoki, Finland.
Year: 2011.
More info: Transporting railway bridges using hauling and skidding techniques and the SPMT technique. The SPMT transportation was the first of its kind in Finland. The bridges weighed approximately 500 t and 1200 t respectively.

Location: Hammerfest, Norway.
Year: 2011.
More info: ENI Norge is preparing for development of the Goliat field located in the Barents Sea. Technip has been awarded the EPCI contract for development, supply and installation of the Flowline and Riser systems connecting the subsea production systems with the Goliat floating production, storage and offloading, including the installation of the subsea templates. The current schedule is based on having 1st oil in November 2013. Polarbase AS operating in Hammerfest in port of Rypefjord is responsible, as the subcontractor of Technip Norge, for support functions regarding the shuttle services of offshore drilling platforms and oil and gas fields. Polarbase utilized Havator Transport’s special expertise in transfers of Goliat project’s subsea templates from storage area to port of Rypefjord. Goliat site move operation was the first major spmt-contract for Havator Transport in Norwegian Oil & Gas industry and therefore very significant.
Havator Transport activites, performed on behalf of Technip on site in Rypefjord:
- 32-axles of SPMT equipment on site + team to operate (smpt = self propelled modular transporter)
- Havator Transport's responsibility was to move 320 ton template (8 units) at storage area in port of Rypefjord
- templates had been delivered to port of Rypefjord by Heavy Lift vessel in two lots, 4+4, and Havator Transport moved units from quay side onto storage area
- afterwards templates were collected one-by-one to be transported by vessels further to final location at oil field, in this face Havator Transport moved the templates back to quay edge
- Havator Transport mobilized equipment to Rypefjord mid March and project was finished Havator Transport's part by end of May

Location: Olkiluoto, Finland.
Year: 2011.





Location: Kalajoki, Finland.
Year: 2011.




Location: Sodankylä, Finland.
Year: 2011.
More info: Havator Transport is having a major role for supplying logistical services for Kevitsa mining project.


Location: Timrå, Sweden.
Year: 2011.




Location: Rauma, Finland.
Year: 2011.
More info: Discharging the vessel, local transport and jacking onto foundations.

Location: Gdynia, Poland.
Year: 2011.








Location: Alizay, France.
Years: 2010-2011.
More info: Havator Transport Oy together with its partners supplied crane operations and special transports of turbine and generator from F-Alizay to Finland at October 2010. At February 2011 Havator carried out further transportations to S-Husum where items were lifted by means 350tn mobile crane, skidded in and further positioned onto foundations with Hydrospex SL125. Skidding and support equipment used at this technically demanding site weighed altogether approx 100 tonnes. Packed ices at Gulf of Bothnia stopped ferry traffic and forced to proceed by northern route via Tornio/Haparanda. Due to driving height of 498cm transports faced some challenges en route but they were won by professional and precise work.



Location: Finspång, Sweden.
Year: 2011.
Equipment: MAN heavy truck with 12 axled Goldhofer and Liebherr 500 ton mobile crane.
More info: Havator Cranes working together with Havator Transport.




Location: Rauma, Finland.
Year: 2010.
More info: Havator lifted (Demag CC 2800) from a ship at Port of Rauma a 280-ton transformer, which was transported through the city to Kuivassuo's transformer station. Havator Transport's equipment consisted of three trucks and a 16-axled carriage. At the transformer station Havator installed the transformer onto rails.


Location: Kemi, Finland.
Year: 2010.

i

Location: Strängstorp, Katrineholm, Sweden.
Year: 2010.
More info: The house measured 11 x 9 x 10 metres. Weight 78 tonnes.


Location: Ale, Sweden.
Year: 2010.





Location: Vaasa, Finland.
Year: 2010.




Location: Pietarsaari, Finland.
Year: 2010.
More info: Road transports, crawler crane on site lifting + skid tracks to move sections out/in building.

Location: Pori, Finland.
Year: 2010.

Location: Gothenburg, Sweden.
Year: 2010.

Location: Uimaharju, Finland.
Year: 2010.

Location: Pälkäne, Finland.
Year: 2010.




Location: Kemijärvi, Finland.
Year: 2010.


Location: Oulu, Finland.
Year: 2010.
More info: Loading in Kemijärvi with Havator Cranes equipment. Transported components: Vaporizer unit (19 x 6.0 x 6.0 / 140 tonnes, total weight of the combination 195 tonnes) + black liquor battery (16 x 8.0 x 8.25 / 70 tonnes, total weight of the combination 135 tonnes).



Location: Malmö, Sweden.
Year: 2010.
More info in Swedish: http://www.byggvarlden.se/nyheter/byggprojekt/article145099.ece



Location: Stockholm, Sweden.
Year: 2010.




Location: Inkoo, Finland.
Year: 2010.
More info: 281 t transformer delivery, lifting trafo from arriving vls with CC2800, delivery onto sub-station and jacking onto foundation.


Location: Porvoo, Finland.
Year: 2010.
More info: Lattice-boom crawler cranes Terex-Demag CC2200 and Sennebogen SL5500 were used in replacement operation of the 155-ton reactor. Havator Transport handled the transportation of the old reactor as
well as the worksite transportation of the new reactor.




Location: Norrköping, Sweden.
Year: 2010.
More info: transport of 11 cabledrums (weight 65 and 80 tons). Unloading together with Havator AB in Norrköping with 250 ton crane.

Location: Älvängen, Sweden.
Year: 2010.
Equipment: 4 x 20 axles THP/SL.
More info: The house measured 29 x 12 x 11,5 metres. Weight 250 tonnes.

Location: Tampere, Finland.
Year: 2010.
Equipment: Goldhofer THP/XLE-8 (cap. 105 t).


Location: Peipohja-Pori, Finland.
Year: 2010.



Location: Vänersborg, Sweden.
Year: 2010.
Equipment: Vehicle Man and THP/SL 13 axles.
More info: The weight of press 118 tonnes. Measurement 5,55 x 3,04 x 2,5 meters. Loading in Antwerp, transport to Gent and by ferry across to Gothenburg. From there transport to Vänersborg.

Location: Uddevalla, Sweden.
Year: 2010.
Equipment: Trailer 4 + 9 axles, two cranes LTM 1100.
More info: Lift and transport of two plasticsprayers for Uddelvalla specialtransport, weight 1 x 87 tonnes and 1 x 117 tonnes.



Location: Finspång - Norrköping, Sweden.
Year: 2009.


Location: Sollefteå, Sweden.
Year: 2009.
More info: Havator Transport delivered two 107 tonnes transf
ormers from Austria to Sweden. All-in-project included freight, storage, lift onto foundation, specialtransport and jacking-operations.

Year: 2009.
Location: Jyväskylä, Finland.
More info: The stator (193 tonnes) arrived on a railway carriage and was loaded on to a trailer. After that, transport on the trailer to the turbine hall and skidding on to base. The final assembly lift on to the base was carried out from a track.

Location: Pori, Finland.
Year: 2009.
Equipment: 2x16-axles spmt + 2xpower packs.
More info: steel construction's weight 400 tons.




Location: Paldiski, Estonia.
Year: 2009.
Equipment: SPMT.
More info: The total weight of the cranes was 400 tonnes each.



Location: Pori, Finland.
Year: 2009.
More info: Total weight of transport, 183 tonnes. Width 6,20 m and height 7,45 m.






Location: Pietarsaari, Finland.
Year: 2009.
More info: The weight of the components was 150 and 153,5 tonnes measuring 18 x D 6,5 m. Driving height 7,7 m. The total weight of one combination including the trailer was 260 tonnes.

Location: Landskrona, Sweden.
Year: 2009 (July).
Equipment: Two trailers (THP-SL).
More info: This chemicals tank was transported 200 - 300 metres inside an industrial area. The tank was 60 tonnes in weight, 15.5 metres in diameter and 10 metres in height. Since the tank was fragile, two trailers were required to carry out the transport.



Location: Jyväskylä, Finland.
Year: 2009.
More info: Upon arrival the 109-tonne transformer was skidded on to the base.




Location: Lieto, Finland.
Year: 2009.
More info: Lift from arriving ship, transfer to railway truck, rail transport, transfer to trailer, road transport and unloading at transformer station

Location: Olkiluoto, Finland.
Year: 2009.
More info: the 1,250-tonne lattice boom crane was transported in parts for the project.

Location: Umeå, Sweden.
Year: 2009.
More info: the turbine weighed 120 tonnes.

Location: Oskarshamn, Sweden.
Year: 2009.
Equipment: SPMT.
More info: the rotor weighed 270 tonnes.


Location: Pori, Finland.
Year: 2009.
Equipment: SPMT.
More info: the transported object was 120 metres long, 8 metres in diameter amd weighed 1,600 tonnes.


Location: Raahe, Finland.
Year: 2009.
More info: The project included hauling the blast frunace gas cleaner from the hall to an open space then using hydraulicsto be lifted into position for transport, and onto a trailer. Then it was lifted using jacks on supports and the lift from the supports was carried out using a lattice boom crane Demag CC 2800.

Location: Nyköping, Sweden.
Year: 2008.
Equipment: SPMT.
More info: In Nyköping a railway bridge that was alomost 100 years old and weighed 200 tonnes was replaced with a new bridge weighing 320 tonnes. The lift was carried out completely from land using a 1,250-tonne Terex Demag PC/CC 6800. Transport of the bridges was carried out by Havator Transport using SPMT equipment.

Location: Kokkola, Finland.
Year: 2008.
Equipment: two trailers from Havator Transport side by side
More info: the old filter weighed 155 tonnes and the new one 222 tonnes.

Location: Gothenburg, Sweden.
Year: 2008.
More info: size of object 16 x 5.8 x 7.3 metres and total transported weight 110 tonnes.

Location: Porvoo, Finland.
Year: 2008.
Equipment: SPMT.
More info: the length of the reactor was 37 metres, diameter four metres and weight almost 300 tonnes.

Location: Orust, Sweden.
Year: 2008.
More info: the house weighed 70 tonnes (24 x 10 m) and the stretch was 2 km on the island of Orust. On the picture, an interested reporter.

Location: Vuosaari, FInland.
Year: 2008.
Equipment: SPMT.
More info: the harbour crane weighed 1,300 tonnes.

Location: Aitik, Sweden.
Year: 2008.
More info: Havator Transport has completed over 1,000 shipments of steel for the concentrator at Aitik copper mine. At Aitik, Havator Group has made use of its own synergy advantages. The steel constructions were lifted into place by Havator Cranes and erected by Havator Montage.

Location: Mazeikiah, Lithuania
Yeari: 2008.
More info: transport of a reactor, a challenge due to road conditions, in Lithuania. The reactor was transported from the port of Klaipeda to Mazeikiah, a distance of 150 kilometres. The reactor weighed 530 tonnes (gross vehilce weight 700 tonnes).

Location: Pori, Finland.
Year: 2008
Equipment: SPMT.
More info: length of the object 84 m, diameter 6.50 m and weight 450 t.

Location: Kalajoki, Finland.
Year: 2008.

Location: Kittilä, Finland.
Year: 2008.

Location: Oskarshamn, Sweden.
Year: 2008.
Equipment: SPMT.
More info: In Simpevar Harbour a generator with parts was unloaded fro the ship onto the dockside using SPMT equipment. From here, the transport continued just over one kilometre to the assembly site at Oskarshamn Nuclear Power Plant. The generator alone weighed 450 tonnes.

Location: Tornio, Finland.
Year: 2007.
More info: the total weight transported from Röyttä Harbour was over 200 tonnes.

Location: Pori, Finland.
Year: 2007.
Equipment: SPMT.
More info: the weight transported was altogether 610 tonnes and the distance 2 kilomtres.

Location: Högsåra, Finland.
Year: 2007.
More info: In spring 2007, Högsåra windpower project for three windpower plants in Turku Archipelago ushered in a new era in Havator Group's history. Havator Group's turnkey solution proved to be a solidly functional service package, where Havator Transport provided the transport, Havator Cranes the lifting and Havator Montage the erection.
Transport of oil platform section

Location: Pori, Finland.
Year: 2007.
Equipment: Goldhofer THP/SL axles.

Location: Voikkaa, Finland.
Year: 2007.
Equipment: SPMT.
More ino: the transported tank was 11 metres in diameter and the rig height was 14 metres. the distance was 2 kilometres.

Location: Ringhals, Sweden.
Year: 2007
Equipment: 12-axle hydraulic module trailer, towing vehicles and haulage group.
More info: a 310-tonne steam generator, lift with jacks and och transport from Ringhals to Studsvik

Location: Pori, Finland.
Year: 2003.
Equipment: 80 Goldhofer THP/SL axles.
More info: this was the heaviest short transport in the history of Havator Transport. Such transports are today carried out using SPMT equipment.