Havator Oy

References - transport

Crusher unit on track 70 t

- - - murskain.jpg

Location: Tampere, Finland.
Year: 2010.
Equipment: Goldhofer THP/XLE-8  (cap. 105 t).

Transport of a vessel from Peipohja to Pori

- - - aluksensiirto.jpg

- - - aluksensiirto2.jpg

Location: Peipohja-Pori, Finland.
Year: 2010.

Transport of a press from Antwerp to Vänersborg

- - - press1.jpg

- - - press2.jpg

- - - press3.jpg

Location: Vänersborg, Sweden.
Year: 2010.
Equipment: Vehicle Man and THP/SL 13 axles.
More info: The weight of press 118 tonnes. Measurement 5,55 x 3,04 x 2,5 meters. Loading in Antwerp, transport to Gent and by ferry across to Gothenburg. From there transport to Vänersborg.

Lift and transport of plasticsprayers

- - - uddevalla.jpg

Location: Uddevalla, Sweden.
Year: 2010.
Equipment: Trailer 4 + 9 axles, two cranes LTM 1100.
More info: Lift and transport of two plasticsprayers for Uddelvalla specialtransport, weight 1 x 87 tonnes and 1 x 117 tonnes.

Transport of turbine

- - - siemens-turbin-2009-12-04-008.jpg

- - - siemens-turbin-2009-12-04-014.jpg

- - - siemens-turbin-2009-12-04-017.jpg

Location: Finspång - Norrköping, Sweden.
Year: 2009.

Transport of transformers from Austria

- - - muuntajansiirto.jpg

- - - muuntajansiirto2.jpg

Location: Sollefteå, Sweden.
Year: 2009.
More info: Havator Transport delivered two 107 tonnes transf ormers from Austria to Sweden. All-in-project included freight, storage, lift onto foundation, specialtransport and jacking-operations.

Transport of generator stator

- - - s<mce:script type=

Year: 2009.
Location: Jyväskylä, Finland.
More info: The stator (193 tonnes) arrived on a railway carriage and was loaded on to a trailer. After that, transport on the trailer to the turbine hall and skidding on to base. The final assembly lift on to the base was carried out from a track.

Steel construction site move

- - - 216spmt.jpg

Location: Pori, Finland.
Year: 2009.
Equipment: 2x16-axles spmt + 2xpower packs.
More info: steel construction's weight 400 tons.

Transport of two harbor cranes from one berth to another

- - - spmt1.jpg

 

- - - spmt2.jpg

- - - spmt4.jpg

- - - spmt5.jpg

Location: Paldiski, Estonia.
Year: 2009.
Equipment: SPMT.
More info: The total weight of the cranes was 400 tonnes each.

Transport of condensers from Heinola to Mäntyluoto

- - - lauhdutin1.jpg

 

- - - lauhdutin2.jpg

- - - lauhdutin3.jpg

Location: Pori, Finland.
Year: 2009.
More info: Total weight of transport, 183 tonnes. Width 6,20 m and height 7,45 m.

Debarking drum transport from Varkaus to Pietarsaari

- - - kuorimarumpu1.jpg

- - - kuorimarumpu2.jpg

- - - kuorimarumpu3.jpg

- - - kuorimarumpu4.jpg

- - - kuorimarumpu5.jpg

- - - kuorimarumpu6.jpg

Location: Pietarsaari, Finland.
Year: 2009.
More info: The weight of the components was 150 and 153,5 tonnes measuring 18 x D 6,5 m. Driving height 7,7 m. The total weight of one combination including the trailer was 260 tonnes.

Tank transport in Landskrona

- - - kuljetus34.jpg

Location: Landskrona, Sweden.
Year: 2009 (July).
Equipment: Two trailers (THP-SL).
More info: This chemicals tank was transported 200 - 300 metres inside an industrial area. The tank was 60 tonnes in weight, 15.5 metres in diameter and 10 metres in height. Since the tank was fragile, two trailers were required to carry out the transport.

 

Transformer transport from Poland to Finland

- - - kuljetus27.jpg

- - - kuljetus28.jpg

- - - kuljetus29.jpg

Location: Jyväskylä, Finland.
Year: 2009.
More info: Upon arrival the 109-tonne transformer was skidded on to the base.

 

Shipment of a 281-tonne transformer

- - - kuljetus30.jpg

- - - kuljetus31.jpg

- - - kuljetus32.jpg

- - - kuljetus33.jpg

Location: Lieto, Finland.
Year: 2009.
More info: Lift from arriving ship, transfer to railway truck, rail transport, transfer to trailer, road transport and unloading at transformer station

 

Terex Demag CC/PC 6800 arrives at Olkiluoto

- - - kuljetus25.jpg

Location: Olkiluoto, Finland.
Year: 2009.
More info: the 1,250-tonne lattice boom crane was transported in parts for the project.

 

Turbine transport from Holmsund Harbour

- - - kuljetus26.jpg

Location: Umeå, Sweden.
Year: 2009.
More info: the turbine weighed 120 tonnes.

 

Transport of generator parts

- - - kuljetus22.jpg

Location: Oskarshamn, Sweden.
Year: 2009.
Equipment: SPMT.
More info: the rotor weighed 270 tonnes.

 

Transport of windpower mast

- - - kuljetus23.jpg

<mce:script type=- - - kuljetus24.jpg" width="340" height="255" ismap="65535" />

Location: Pori, Finland.
Year: 2009.
Equipment: SPMT.
More info: the transported object was 120 metres long, 8 metres in diameter amd weighed 1,600 tonnes.

 

Transport of blast furnace gas cleaner 

- - kuljetus20.jpg

- - kuljetus19.jpg

Location: Raahe, Finland.
Year: 2009.
More info: The project included hauling the blast frunace gas cleaner from the hall to an open space then using hydraulicsto be lifted into position for transport, and onto a trailer. Then it was lifted using jacks on supports and the lift from the supports was carried out using a lattice boom crane Demag CC 2800.

 

Pioneering approach to railway bridge replacement

Location: Nyköping, Sweden.
Year: 2008.
Equipment: SPMT.
More info: In Nyköping a railway bridge that was alomost 100 years old and weighed 200 tonnes was replaced with a new bridge weighing 320 tonnes. The lift was carried out completely from land using a 1,250-tonne Terex Demag PC/CC 6800. Transport of the bridges was carried out by Havator Transport using SPMT equipment.

 

Replacement of electrostatic filter using two parallel trailers

Location: Kokkola, Finland.
Year: 2008.

Equipment: two trailers from Havator Transport side by side
More info: the old filter weighed 155 tonnes and the new one 222 tonnes. 

Transport of gas cleaner, Gothenburg

Location: Gothenburg, Sweden.
Year: 2008.
More info: size of object 16 x 5.8 x 7.3 metres and total transported weight 110 tonnes.

 

Reactor transport

Location: Porvoo, Finland.
Year: 2008.
Equipment: SPMT.
More info: the length of the reactor was 37 metres, diameter four metres and weight almost 300 tonnes.

 

Moving house, Orust island

Location: Orust, Sweden.
Year: 2008.
More info: the house weighed 70 tonnes (24 x 10 m) and the stretch was 2 km on the island of Orust. On the picture, an interested reporter.

 

Harbour crane unloaded from pontoon

Location: Vuosaari, FInland.
Year: 2008.
Equipment: SPMT.
More info: the harbour crane weighed 1,300 tonnes.

 

A thousand truckloads of steel

Location: Aitik, Sweden.
Year: 2008.
More info: Havator Transport has completed over 1,000 shipments of steel for the concentrator at Aitik copper mine. At Aitik, Havator Group has made use of its own synergy advantages. The steel constructions were lifted into place by Havator Cranes and erected by Havator Montage.

 

Reactor transport

Location: Mazeikiah, Lithuania
Yeari: 2008.
More info: transport of a reactor, a challenge due to road conditions, in Lithuania. The reactor was transported from the port of Klaipeda to Mazeikiah, a distance of 150 kilometres. The reactor weighed 530 tonnes (gross vehilce weight 700 tonnes).  

Transport of Finland's heaviest pressure vessel

Location: Pori, Finland.
Year: 2008
Equipment: SPMT.
More info: length of the object 84 m, diameter 6.50 m and weight 450 t.

 

Transport of suction anchor from Raahe to Kalajoki

Location: Kalajoki, Finland.
Year: 2008.

 

GoldBox to Suurkuusiko gold mine

Location: Kittilä, Finland.
Year: 2008.

 

Transport of generator at harbour

Location: Oskarshamn, Sweden.
Year: 2008.
Equipment: SPMT.
More info:  In Simpevar Harbour a generator with parts was unloaded fro the ship onto the dockside using SPMT equipment. From here, the transport continued just over one kilometre to the assembly site at Oskarshamn Nuclear Power Plant. The generator alone weighed 450 tonnes.

Transport of autoclave

Location: Tornio, Finland.
Year: 2007.
More info: the total weight transported from Röyttä Harbour was over 200 tonnes.

 

Two-kilometre transport of harbour crane

Location: Pori, Finland.
Year: 2007.
Equipment: SPMT.
More info: the weight transported was altogether 610 tonnes and the distance 2 kilomtres.

 

Transport, lift and erection of windpower components

Location: Högsåra, Finland.
Year: 2007.
More info: In spring 2007, Högsåra windpower project for three windpower plants in Turku Archipelago ushered in a new era in Havator Group's history. Havator Group's turnkey solution proved to be a solidly functional service package, where Havator Transport provided the transport, Havator Cranes the lifting and Havator Montage the erection.

Transport of oil platform section

 

 

Location: Pori, Finland.
Year: 2007.
Equipment: Goldhofer THP/SL axles.

 

Transport of spherical tank using SPMT equipment

Location: Voikkaa, Finland.
Year: 2007.
Equipment: SPMT.
More ino: the transported tank was 11 metres in diameter and the rig height was 14 metres. the distance was 2 kilometres.

 

Transport of steam generator

- - - kuljetus21.jpg

Location: Ringhals, Sweden.
Year: 2007
Equipment: 12-axle hydraulic module trailer, towing vehicles and haulage group.
More info: a 310-tonne steam generator, lift with jacks and och transport from Ringhals to Studsvik 

2,260-tonne short transport in dockside area

Location: Pori, Finland.
Year: 2003.
Equipment: 80 Goldhofer THP/SL axles.
More info: this was the heaviest short transport in the history of Havator Transport. Such transports are today carried out using SPMT equipment.

 

Branch:
Country:
City:
Title: