Location: Tampere, Finland.
Year: 2010.
Equipment: Goldhofer THP/XLE-8 (cap. 105 t).


Location: Peipohja-Pori, Finland.
Year: 2010.



Location: Vänersborg, Sweden.
Year: 2010.
Equipment: Vehicle Man
and THP/SL 13 axles.
More info: The weight
of press 118 tonnes. Measurement 5,55 x 3,04 x 2,5
meters. Loading in Antwerp, transport to Gent and by ferry across to
Gothenburg. From there transport to Vänersborg.

Location: Uddevalla, Sweden.
Year: 2010.
Equipment: Trailer 4 + 9 axles, two cranes LTM 1100.
More info: Lift and transport of two plasticsprayers for Uddelvalla specialtransport, weight 1 x 87 tonnes and 1 x 117 tonnes.



Location: Finspång - Norrköping, Sweden.
Year: 2009.


Location: Sollefteå, Sweden.
Year: 2009.
More info: Havator Transport delivered two 107
tonnes transf
ormers from Austria to Sweden. All-in-project included freight,
storage, lift onto foundation, specialtransport and jacking-operations.

Year: 2009.
Location: Jyväskylä, Finland.
More info: The stator (193 tonnes) arrived on a railway carriage and was loaded on to a trailer. After that, transport on the trailer to the turbine hall and skidding on to base. The final assembly lift on to the base was carried out from a track.

Location: Pori, Finland.
Year: 2009.
Equipment: 2x16-axles spmt + 2xpower packs.
More info: steel construction's weight 400 tons.




Location: Paldiski, Estonia.
Year: 2009.
Equipment: SPMT.
More info: The total weight of the cranes was 400 tonnes each.



Location: Pori, Finland.
Year: 2009.
More info: Total weight of transport, 183
tonnes. Width 6,20 m and height 7,45 m.






Location: Pietarsaari, Finland.
Year: 2009.
More info: The weight of the components was
150 and 153,5 tonnes measuring 18 x D 6,5 m. Driving height 7,7 m. The total
weight of one combination including the trailer was 260 tonnes.

Location: Landskrona, Sweden.
Year: 2009 (July).
Equipment: Two trailers (THP-SL).
More info: This chemicals tank was transported 200 - 300 metres inside an industrial area. The tank was 60 tonnes in weight, 15.5 metres in diameter and 10 metres in height. Since the tank was fragile, two trailers were required to carry out the transport.



Location: Jyväskylä, Finland.
Year: 2009.
More info: Upon arrival the 109-tonne transformer was skidded on to the base.




Location: Lieto, Finland.
Year: 2009.
More info: Lift from arriving ship, transfer to railway truck, rail transport, transfer to trailer, road transport and unloading at transformer station

Location: Olkiluoto, Finland.
Year: 2009.
More info: the 1,250-tonne lattice boom crane was transported in parts for the project.

Location: Umeå, Sweden.
Year: 2009.
More info: the turbine weighed 120 tonnes.

Location: Oskarshamn, Sweden.
Year: 2009.
Equipment: SPMT.
More info: the rotor weighed 270 tonnes.

- - - kuljetus24.jpg" width="340" height="255" ismap="65535" />
Location: Pori, Finland.
Year: 2009.
Equipment: SPMT.
More info: the transported object was 120 metres long, 8 metres in diameter amd weighed 1,600 tonnes.


Location: Raahe, Finland.
Year: 2009.
More info: The project included hauling the blast frunace gas cleaner from the hall to an open space then using hydraulicsto be lifted into position for transport, and onto a trailer. Then it was lifted using jacks on supports and the lift from the supports was carried out using a lattice boom crane Demag CC 2800.

Location: Nyköping, Sweden.
Year: 2008.
Equipment: SPMT.
More info: In Nyköping a railway bridge that was alomost 100 years old and weighed 200 tonnes was replaced with a new bridge weighing 320 tonnes. The lift was carried out completely from land using a 1,250-tonne Terex Demag PC/CC 6800. Transport of the bridges was carried out by Havator Transport using SPMT equipment.

Location: Kokkola, Finland.
Year: 2008.
Equipment: two trailers from Havator Transport side by side
More info: the old filter weighed 155 tonnes and the new one 222 tonnes.

Location: Gothenburg, Sweden.
Year: 2008.
More info: size of object 16 x 5.8 x 7.3 metres and total transported weight 110 tonnes.

Location: Porvoo, Finland.
Year: 2008.
Equipment: SPMT.
More info: the length of the reactor was 37 metres, diameter four metres and weight almost 300 tonnes.

Location: Orust, Sweden.
Year: 2008.
More info: the house weighed 70 tonnes (24 x 10 m) and the stretch was 2 km on the island of Orust. On the picture, an interested reporter.

Location: Vuosaari, FInland.
Year: 2008.
Equipment: SPMT.
More info: the harbour crane weighed 1,300 tonnes.

Location: Aitik, Sweden.
Year: 2008.
More info: Havator Transport has completed over 1,000 shipments of steel for the concentrator at Aitik copper mine. At Aitik, Havator Group has made use of its own synergy advantages. The steel constructions were lifted into place by Havator Cranes and erected by Havator Montage.

Location: Mazeikiah, Lithuania
Yeari: 2008.
More info: transport of a reactor, a challenge due to road conditions, in Lithuania. The reactor was transported from the port of Klaipeda to Mazeikiah, a distance of 150 kilometres. The reactor weighed 530 tonnes (gross vehilce weight 700 tonnes).

Location: Pori, Finland.
Year: 2008
Equipment: SPMT.
More info: length of the object 84 m, diameter 6.50 m and weight 450 t.

Location: Kalajoki, Finland.
Year: 2008.

Location: Kittilä, Finland.
Year: 2008.

Location: Oskarshamn, Sweden.
Year: 2008.
Equipment: SPMT.
More info: In Simpevar Harbour a generator with parts was unloaded fro the ship onto the dockside using SPMT equipment. From here, the transport continued just over one kilometre to the assembly site at Oskarshamn Nuclear Power Plant. The generator alone weighed 450 tonnes.

Location: Tornio, Finland.
Year: 2007.
More info: the total weight transported from Röyttä Harbour was over 200 tonnes.

Location: Pori, Finland.
Year: 2007.
Equipment: SPMT.
More info: the weight transported was altogether 610 tonnes and the distance 2 kilomtres.

Location: Högsåra, Finland.
Year: 2007.
More info: In spring 2007, Högsåra windpower project for three windpower plants in Turku Archipelago ushered in a new era in Havator Group's history. Havator Group's turnkey solution proved to be a solidly functional service package, where Havator Transport provided the transport, Havator Cranes the lifting and Havator Montage the erection.
Transport of oil platform section

Location: Pori, Finland.
Year: 2007.
Equipment: Goldhofer THP/SL axles.

Location: Voikkaa, Finland.
Year: 2007.
Equipment: SPMT.
More ino: the transported tank was 11 metres in diameter and the rig height was 14 metres. the distance was 2 kilometres.

Location: Ringhals, Sweden.
Year: 2007
Equipment: 12-axle hydraulic module trailer, towing vehicles and haulage group.
More info: a 310-tonne steam generator, lift with jacks and och transport from Ringhals to Studsvik

Location: Pori, Finland.
Year: 2003.
Equipment: 80 Goldhofer THP/SL axles.
More info: this was the heaviest short transport in the history of Havator Transport. Such transports are today carried out using SPMT equipment.